Category: UncategorizedBy siven10.09.2016Share this post Author: siven Post navigationPreviousPrevious post:The production capacity of Siven Bulgaria is increasedNextNext post:“Siven Bulgaria” Ltd. signed for grants under the operational program “Competitiveness and Innovation”Related PostsOn 10.04.2023 “Siven Bulgaria” OOD concluded Contract No. BG-RRP-3.004-1386-C01 for grant-in-aid under the National Recovery Plan operational program and sustainability”, procedure BG-RRP-3.004 “Technological modernization”, name of project proposal “Technological modernization in the enterprise”14.12.2023Siven Bulgaria accredits fabric for protective overalls with certificate 141 26 + AC25.06.2020When high technology helps our production, we achieve high results22.04.2019New inovative fabric01.04.2019SIVEN jackets project 201914.01.2019SIVEN increase the production capacity of sublimation05.07.2018
On 10.04.2023 “Siven Bulgaria” OOD concluded Contract No. BG-RRP-3.004-1386-C01 for grant-in-aid under the National Recovery Plan operational program and sustainability”, procedure BG-RRP-3.004 “Technological modernization”, name of project proposal “Technological modernization in the enterprise”14.12.2023